Construction of two check dams in Vasant Kunj Phase II, and;
Construction of six check dams in
Sanjay Van which lies north of Vasant Kunj sector D.
DDA has also approached the Resident Welfare Associations (RWA) to fully involve them
in the rainwater harvesting in their areas. It has also drawn up an institutional
mechanism to provide technical and financial assistance to these RWAs.
With the construction of the above two schemes, approximately 300 hectares of area
shall stand harvested. Allowing for evaporation, runoff and overflow, it has been
estimated that the two dams would store about 36,000 cubic metres (cum) of stormwater.
Based on studies carried out by the Central Ground Water Board (CGWB), it is anticipated
that about 75 per cent of this stored water will be recharged into the groundwater.
The objectives of the committee, constituting of K P Lakshmana Rao, finance member,
DDA, R K Bhandari, engineering member, DDA and Sunita Narain, deputy director, Centre for
Science and Environment, were:
To execute the first phase water harvesting projects in DDA
colonies, i.e. Vasant Kunj, to meet water shortage, and;
To execute the works with a view to have the benefit of the next
monsoon in the water-scarce areas.
To meet their immediate objective the committee suggested that a three-tier approach be
adopted:
The first tier could be for rooftop harvesting in residential
pockets.
The second tier would apply to the
area within the residential pockets other than the rooftop component.
The third tier would relate to
schemes such as check dams, percolation dams, etc., which would aim at capturing the water
outside the residential pockets.
To achieve the first and second tier approach, it was proposed that the RWAs should
implement them. The committee also suggested that there should be active participation
from the residents and NGOs towards maintenance and upkeep of these systems.
The municipal body or a developing agency would be responsible for the third tier, as
per the committee’s proposal. They would be also be responsible for the formulation,
total execution and monitoring of these projects.